Skip Ribbon Commands
Skip to main content

User

You can edit your user data or change your password here.

Login

​​​If you are already registered, please enter your e-mail address and password below and click "LOGIN".

FORGOT YOUR PASSWORD?​

 

No access data yet? Now click on REGISTER.

Register

Es reicht eine Seite, die - richtig angelegt - sowohl auf verschiedenen Browsern im Netz funktioniert, aber ebenso gut für den Ausdruck oder die Darstellung auf einem Handy geeignet ist. Wohlgemerkt: Eine Seite für alle Formate.

ForgottenPW

AKSHeaderItemTypeForgottenPW Content

ChangePW

AKSHeaderItemTypeChangePW Content

Search

Languages

Country

EOD Tower

  • Picture 1/4
  • Picture 2/4
  • Picture 3/4
  • Picture 4/4

​​The new office building for the Raiffeisen Holding NÖ-Wien on the Vienna Danube Canal is a milestone building for climate protection, conservation of resources and energy efficiency and is an international example as a certified office high-rise. This addition to the Raiffeisenhaus is certified according to the criteria for certification of nonresidential, passive buildings by the Passivhausinstitut Darmstadt - Dr. Wolfgang Feist, of the Austrian Institute for Healthy and Ecological Building (IBO quality seal).

As the general consultant and in accordance with the specifications provided by the Raiffeisen-Klimaschutz-Initiative, Vasko+Partner developed the building concept with photovoltaic systems, cooling with the use of  Danube Canal water, utilization of geothermal heat activation, cogeneration running on biogas, as well as a climate control façade. Implementing these ambitious concepts was possible since Vasko+Partner had already been contracted as the general consultant before the dedication of the building. The main structural engineering challenges were two existing high-rises of hybrid construction type located directly at the edge of the construction pit. Operations in both of these buildings had to continue with as little interruption as possible during the construction phase. Alukönigstahl developed a special façade based on the Schüco-Systems AWS 75.SI to achieve this.​

 

​​​Objektdatenblatt EOD Tower.pdf

System features

Object referencesOffice- and administration building
ProductsSpecial construction
Location
1020 Vienna
Austria
Completion date2013
ArchitectDI Dieter Hayde & Arch. DI Ernst Maurer
ClientRaiffeisen-Holding Niederösterreich-Wien
ConstructorSTRABAG AG Hoch- und Ingenieurbau Österreich Ost
CertificatesWeltweit erstes Passivbürohochhaus